...

2005년부터 플라스틱 사출 금형 제조

How to Prepare a Perfect RFQ for Custom Injection Molding Services?

주요 내용
– A neutral 3D CAD file (STEP or IGES format) is mandatory for calculating part volume, weight, and cycle time accurately.
– 2D technical drawings are essential for specifying critical tolerances (GD&T) and surface finishes (SPI standards) that 3D models cannot convey.
– Clearly defining Estimated Annual Usage (EAU) allows the molder to recommend the correct mold classification (e.g., Class 101 vs. Class 103).
– Providing specific resin grades rather than generic descriptions prevents costly requoting delays and ensures material availability.

What Is a Technical Injection Molding RFQ?

A Request for Quotation (RFQ) in the context of custom plastics is a comprehensive technical package containing all necessary data to calculate the cost of the injection mold (tooling) and the unit price of the manufactured part.

Unlike off-the-shelf procurement, sourcing custom plastics requires calculating physics-based variables—cycle time, cooling rates, and material shrinkage—which can only be derived from precise design files and material specifications. A complete RFQ minimizes risk, ensures the quote is actionable, and drastically reduces the lead time for getting accurate molding quotes1.


A 2D PDF drawing is sufficient for a manufacturer to build a custom injection mold.False

2D drawings miss the complex 3D geometry required for CNC programming and volume calculations. A 3D CAD file (STEP) is mandatory for tooling design.

Providing 3D CAD files in STEP format ensures compatibility across all molding software platforms.True

STEP (Standard for the Exchange of Product model data) is the universal ISO standard that eliminates translation errors common with native file formats like SolidWorks or CATIA.

RFQ for Injection Molding
RFQ for Injection Molding

What Are the Essential Data Requirements for an RFQ?

To create a robust injection molding RFQ template2, the following data points must be included. Missing data forces the manufacturer to make assumptions, which leads to "padding" pricing to cover risk or outright "no-quote" decisions.

RFQ Data Checklist

Category Data Point Technical Requirement / Standard Why It Is Critical
Geometry 3D CAD File .STEP (ISO 10303) or .IGES Used to calculate part weight, projected area (clamping force), and runner system design.
허용 오차 2D Drawing .PDF (ASME Y14.5 / ISO 1101) Defines critical dimensions, GD&T, and inspection requirements that affect tooling cost.
재료 Resin Spec Specific Grade (e.g., Sabic Cycolac MG47) "Black Plastic" is insufficient. Density and flow rate determine shrink factor and cost.
Finish 표면 마감 SPI (A-1 to D-3) or VDI 3400 High polish (SPI A-2) requires harder steel and more labor than a textured finish (SPI C-1).
볼륨 EAU / Life Units per year / Total Tool Life Determines mold cavitation (1-cavity vs 4-cavity) and steel hardness selection.

RFQ for Injection Molding
RFQ for Injection Molding

What Is the Step-by-Step Process for Submitting an RFQ?

Following this workflow ensures you cover all STEP file requirements and commercial details necessary for a binding offer.

Step 1: Execute a Non-Disclosure Agreement (NDA)3

Before sharing proprietary designs, establish intellectual property protection. Most reputable molders have a standard mutual NDA.

Step 2: Finalize the 제조 가능성을 위한 설계(DFM)4

Ensure your CAD files are "frozen." If the design is still changing, mark the RFQ as "Budgetary Estimate Only." Changes after the quote usually require a re-quote.

  • Action: Export your native CAD (SolidWorks, Creo) to STEP (.stp) format.

Step 3: Define the Material Strategy

Avoid generic terms like "ABS" or "Polypropylene."

  • Primary Choice: Specify the exact manufacturer and grade (e.g., Covestro Makrolon 2407 PC).
  • Allowable Substitutes: State if "Generic equivalents allowed" to potentially lower costs using local stock.

Step 4: Specify Quantity and Tooling Class

The mold cost is directly tied to the expected life of the tool. Use SPI Mold Classifications5 as a guide:

  • SPI Class 101: >1 Million cycles (Hardened Steel, high cost, long life).
  • SPI Class 103: <500k cycles (Pre-hardened Steel, moderate cost).
  • Prototype: <5k cycles (Aluminum, low cost).

Step 5: Submit the Package

Include the BOM (Bill of Materials) if the project involves assembly or overmolding.


Designating a 'generic' material allows molders to source cheaper, readily available alternatives.True

If specific material properties aren't critical, allowing 'utility grade' or 'generic' resins can significantly reduce unit costs and lead times.

Requesting a 'mirror finish' on all surfaces is a cost-effective way to improve part aesthetics.False

High-gloss finishes require expensive manual hand-polishing of the mold steel and often highlight surface defects like sink marks; they should be used selectively.

RFQ for Injection Molding
RFQ for Injection Molding

How Does RFQ Completeness Impact the Quote?

The quality of the request for quote plastic parts directly correlates to the speed and accuracy of the response.

기능 Detailed/Complete RFQ Incomplete/Vague RFQ
Quote Turnaround 24 – 48 Hours 1 – 2 Weeks (due to Q&A loop)
Pricing Accuracy 높음 (Fixed Price) 낮음 (Subject to change)
Tooling Design Optimized for specific material shrink rates. Risk of dimension errors if material changes later.
Supplier Confidence High; signals a serious buyer. Low; signals an unprepared buyer or "price fishing."

RFQ for Injection Molding
RFQ for Injection Molding

When Should You Use This RFQ Structure?

This rigorous approach is applicable in various sourcing scenarios:

  1. New Product Introduction (NPI): When moving from 3D printed prototypes to the first steel tool.
  2. Tool Transfer: When moving existing molds to a new supplier (requires additional data on current mold condition).
  3. Benchmarking: When validating current supplier pricing against the market.
  4. Cost Reduction Analysis: When asking suppliers to propose design changes to lower unit costs.

RFQ for Injection Molding
RFQ for Injection Molding

자주 묻는 질문(FAQ)

Q: Why do manufacturers insist on STEP files instead of STL files?
A: STL (Stereolithography) files are mesh-based, composed of triangles used for 3D printing. They lack precise geometric surfaces and curves. STEP file requirements are strict because STEP files use vector mathematics (NURBS), allowing for precise CNC machining paths and volume calculations.

Q: What if I don’t know exactly which plastic material to use?
A: In your RFQ, describe the application environment instead. List requirements such as: "Must withstand 100°C," "Must be UV resistant," or "Must be clear." The molder can then recommend a material.

Q: How does the Estimated Annual Usage (EAU)6 affect the mold cost?
A: EAU dictates the "cavitation" of the mold. If you need 100,000 parts/year, a single-cavity mold is too slow; a 4-cavity mold is needed. A 4-cavity mold costs roughly 2-3 times more than a single-cavity mold but produces parts at a much lower unit price.

Q: Can I get a quote with just a physical sample part?
A: Generally, no. While some shops offer reverse engineering, most require a CAD file to quote. Creating CAD from a physical part is a separate service usually charged by the hour.

Q: What is the difference between a "Budgetary Quote" and a "Firm Quote"?
A: A budgetary quote is a rough estimate (+/- 20%) used for feasibility studies. A firm quote is a binding contract offer. A firm quote requires finalized design files and locked material specifications.

RFQ for Injection Molding
RFQ for Injection Molding

요약

Preparing a perfect injection molding RFQ is about removing ambiguity. By providing a clean 3D STEP file, a 2D drawing with defined tolerances, specific material grades, and clear volume expectations, you enable manufacturers to calculate costs accurately. This preparation transforms the interaction from a guessing game into a strategic partnership, ensuring you receive optimized pricing and reliable lead times for your custom plastic projects.



  1. Discover the key elements that influence quote accuracy to ensure better pricing and timelines. 

  2. A comprehensive RFQ template can streamline your procurement process and improve quote accuracy. 

  3. Protecting your designs with an NDA is crucial for maintaining intellectual property security. 

  4. DFM ensures your designs are optimized for production, reducing costs and lead times. 

  5. Learn about SPI classifications to choose the right mold for your production needs. 

  6. Learn how EAU influences mold design and cost, helping you make informed decisions. 

최신 게시물
Facebook
트위터
LinkedIn
Pinterest
Mike Tang 사진
마이크 탕

안녕하세요, 저는이 게시물의 작성자입니다. 저는이 분야에서 10 년 이상 근무했으며 현장 생산 문제, 제품 설계 최적화, 금형 설계 및 프로젝트 예비 가격 평가를 처리하는 일을 담당했습니다. 맞춤형 플라스틱 금형 및 플라스틱 성형 관련 제품을 원하시면 언제든지 저에게 질문하십시오.

나와 연결하기 →
ko_KRKO

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

브랜드에 대한 빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

댓글 작성하기

이 도움말에 대한 자세한 내용을 보려면 "[email protected]"으로 이메일 주소를 입력하세요.

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요:

빠른 견적 요청하기

다음을 통해 도면 및 세부 요구 사항을 보내세요. 

Emial:[email protected]

또는 아래 문의 양식을 작성하세요: